- (A) Less than 6
- (B) Equal to 6
- (C) Not less than 6
- (D) Equal to 7
Civil Engineering Mcqs
- (A) 4d
- (B) 8d
- (C) 12d
- (D) 16d
- (A) 0.3 H
- (B) 0.4 H
- (C) 0.5 H
- (D) 0.7 H
- (A) Twice the diameter
- (B) Thrice the diameter
- (C) Four times the diameter
- (D) Seven times the diameter
- (A) K/x (1 + x/d) + bw
- (B) Kx (1 – x/l) + bw
- (C) Kx (1 + x/l) + bw
- (D) All the above
- (A) 1.25 times the average
- (B) 1.50 times the average
- (C) 1.75 times the average
- (D) 2.0 times the average
- (A) 5 kg/cm2
- (B) 10 kg/cm 2
- (C) 15 kg/cm2
- (D) 20 kg/cm2
- (A) Load
- (B) Temperature stress
- (C) Shrinkage stress
- (D) All the above
- (A) Fixed end
- (B) Free end
- (C) Mid span
- (D) Mid span and fixed support
- (A) Supports
- (B) Mid span
- (C) Every section
- (D) Quarter span

