- (A) 0.6
- (B) 0.7
- (C) 0.8
- (D) 0.9
Civil Engineering Mcqs
- (A) 4 mm
- (B) 5 mm
- (C) 6 mm
- (D) 7 mm
- (A) cAc + m cAsc
- (B) c(A – Asc) + m cAsc
- (C) c[A + (m – 1)ASC]
- (D) All the above
- (A) wl²/4
- (B) wl²/8
- (C) wl²/10
- (D) wl²/12
- (A) Be more at the edges of the foundation
- (B) Be uniform
- (C) Not be uniform
- (D) Be zero at the centre of the foundation
- (A) Nil
- (B) 75 kg/m3
- (C) 150 kg/m 2
- (D) 200 kg/cm 2
- (A) 5 cm
- (B) 10 cm
- (C) 15 cm
- (D) 20 cm
- (A) 20 cm
- (B) 25 cm
- (C) 30 cm
- (D) 35 cm
- (A) f = (P/A) + (Z/M)
- (B) f = (A/P) + (M/Z)
- (C) f = (P/A) + (M/Z)
- (D) f = (P/A) + (M/6Z)
- (A) 10
- (B) 15
- (C) 25
- (D) 20

