- (A) 0.207
- (B) 0.307
- (C) 0.407
- (D) 0.508
Civil Engineering Mcqs
- (A) A joint
- (B) B joint
- (C) C joint
- (D) D joint
- (A) 2/3
- (B) 3/2
- (C) 8/5
- (D) 5/8
- (A) Depth d M
- (B) Depth d 3
- (C) Depth d
- (D) Depth d 1/M
- (A) Straight line formula
- (B) Parabolic formula
- (C) Perry’s formula
- (D) Rankine’s formula
- (A) l/4
- (B) h/4
- (C) l
- (D) l
- (A) 5t tension
- (B) 4t tension
- (C) 4t compression
- (D) 5t compression
- (A) WI/2
- (B) WI²/4
- (C) WI²/8
- (D) WI²/12
- (A) Depth of the section
- (B) Depth of the neutral axis
- (C) Maximum tensile stress at the section
- (D) Maximum compressive stress at the section
- (A) The outer most fibre of the section
- (B) The inner most fibre of the section
- (C) The neutral fibre of the section
- (D) The fibre everywhere

