- (A) 500 vehicles per hour
- (B) 500 vehicles per day
- (C) 5000 vehicles per hour
- (D) 5000 vehicles per day
Civil Engineering Mcqs
- (A) equal radii and equal widths of pavement
- (B) equal radii but pavement width is more at entrance than at exit curve
- (C) equal pavement widths but radius is more at entrance curve than at exit curve
- (D) different radii and different widths of pavement
- (A) to designate traffic lanes
- (B) in roadways meant for two way traffic
- (C) to indicate that overtaking is not permitted
- (D) to designate proper lateral placement of vehicles before turning to different directions
- (A) circular
- (B) elliptical
- (C) tangent
- (D) turbine
- (A) stop lines
- (B) turn markings
- (C) crosswalk lines
- (D) lane lines
- (A) reduces right angled and rear end collisions
- (B) increases right angled and rear end collisions
- (C) reduces right angled collisions but may increase rear end collisions
- (D) reduces rear end collisions but may increase right angled collisions
- (A) regulatory sign
- (B) warning sign
- (C) informatory sign
- (D) none of the above
- (A) 2.5 mm penetration only
- (B) 5.0 mm penetration only
- (C) 7.5 mm penetration only
- (D) both 2.5mm and 5.0 mm penetrations
- (A) more than that in tar
- (B) less than that in tar
- (C) equal to that in tar
- (D) none of the above
- (A) exceptionally strong
- (B) strong
- (C) satisfactory for road surfacing
- (D) unsuitable for road surfacing