- (A) 1.10 to 1.20
- (B) 1.20 to 1.30
- (C) 1.30 to 1.40
- (D) 1.40 to 1.50
Civil Engineering Mcqs
- (A) a/2
- (B) a/3
- (C) a
- (D) a
- (A) (p/bd) [1 + (12ey. y/d²) + (12ex. x/d²)]
- (B) p [1 + (6ey. y/b) + (6ex. x/ b)]
- (C) (p/bd) [1 + (6ey. y/d) + (6ex. x/b)]
- (D) (p/bd) [1 + (ey. y/d) + ( ex. x/d)]
- (A) y = h/l² × (1 – x )
- (B) y = 2h/l² × (1 – x)
- (C) y = 3h/l² × (1 – x)
- (D) y = 4h/l² × (1 – x)
- (A) 30°
- (B) 45°
- (C) 60°
- (D) 90°
- (A) Straight line formula
- (B) Parabolic formula
- (C) Perry’s formula
- (D) Rankine’s formula
- (A) (2w/ × l² at the fixed end
- (B) (3w/ × l² at the fixed end
- (C) (3w/ × l² at the fixed end
- (D) (5w/ × l² at the fixed end
- (A) 6.25 t compressive
- (B) 8.75 t tensile
- (C) t tensile
- (D) t compressive
- (A) A uniformly distributed load w/unit length
- (B) A load varying linearly from zero at one end to w at the other end
- (C) An isolated load at mid span
- (D) None of these
- (A) BD² + mbd²)/6D]
- (B) BD3 + mbd3)/6D]
- (C) BD² + mbd3)/4D]
- (D) BD² + mbd²)/4D]

