- (A) Magnitude
- (B) Direction
- (C) Point of application
- (D) All the above
Civil Engineering Mcqs
- (A) E = 3K (1 – 2/m)
- (B) E = 2N (1 + 1/m)
- (C) (3/2)K (1 – 2/m) = N (1 + 1/m)
- (D) All the above
- (A) (IX + IY)/2
- (B) (IX – IY)/2
- (C) IX + IY
- (D) (I /I )
- (A) L/2
- (B) L/3
- (C) L/4
- (D) L/5
- (A) 2/3
- (B) 3/2
- (C) 5/8
- (D) 8/5
- (A) 100 t compressive
- (B) 100 t tensile
- (C) Zero
- (D) Indeterminate
- (A) L/d
- (B) L/2d
- (C) (L/2d)²
- (D) (L/3d)²
- (A) Is directly proportional to the volume
- (B) Is directly proportional to the square of exerted pressure
- (C) Is inversely proportional to Bulk modulus
- (D) All the above
- (A) Stiffness
- (B) Proof resilience
- (C) Proof stress
- (D) Proof load
- (A) 25 N
- (B) 30 N
- (C) 35 N
- (D) 40 N

