- (A) Total income
- (B) Gross earning
- (C) Total product cost
- (D) Fixed cost
Chemical Engineering Mcqs
- (A) 1 to 5
- (B) 10 to 20
- (C) 25 to 35
- (D) 35 to 45
- (A) Decreases
- (B) Increases
- (C) Remains the same
- (D) May increase or decrease, depending upon whether the fluid is Newtonian or non-Newtonian
- (A) 2
- (B) 10
- (C) 30
- (D) 50
- (A) Viscosity of the fluid
- (B) Density of the fluid
- (C) Total cost considerations (pumping cost plus fixed cost of the pipe)
- (D) None of these
- (A) 0.1
- (B) 0.6
- (C) 0.2
- (D) 0.8
- (A) Product inventory
- (B) In-process inventory
- (C) Minimum cash reserve
- (D) Storage facilities
- (A) Cost benefit analysis
- (B) Floor area availability
- (C) Terminal parameters
- (D) Evaporation capacity required
- (A) Raw materials inventory
- (B) Utilities plants
- (C) Process equipment
- (D) Emergency facilities
- (A) 15%
- (B) 10%
- (C) 1.5%
- (D) 150%

