- (A) 2.5-3.0
- (B) 5-7.5
- (C) 10-12.5
- (D) 15-20
Chemical Engineering Mcqs
- (A) Inadequate equipment design
- (B) Faulty operating procedures
- (C) Improper layout of the equipments
- (D) Failure of equipments
- (A) 4 A/P
- (B) A/P
- (C) 4 P/A
- (D) √A
- (A) Least radius of gyration
- (B) Axis of the load
- (C) Perpendicular to the axis of the load
- (D) None of these
- (A) Permissible slot velocity
- (B) Tray diameter
- (C) Liquid load
- (D) Vapor load
- (A) 75% cut segmental baffle
- (B) 25% cut segmental baffle
- (C) Orifice baffle
- (D) Disk and doughnut baffle
- (A) Equal to
- (B) Half
- (C) One fourth
- (D) Three fourth
- (A) Positive
- (B) Negative
- (C) No
- (D) None of these
- (A) 10
- (B) 50
- (C) 100
- (D) 200
- (A) Maximum permissible vapour velocity
- (B) Flooding limit of the column
- (C) Total cost consideration (fixed cost of the column plus the cooling water & steam cost)
- (D) None of these