Exam preparation MCQs with answers

Practice Pakistan's most useful MCQs for competitive exams

Prepare for NTS, PPSC, FPSC and subject-wise tests with fresh multiple choice questions, clear options and quick answer reveal.

Latest MCQs

Boiler H.P. is defined as the ________________ ?
  • (A)  steam evaporation rate per kg of fuel fired
  • (B)  work done in evaporating 1 kg of steam per hour from and at 100°C into dry saturated steam
  • (C)  the evaporation of 15.65 kg of water per hour from and at 100°C into dry saturated steam
  • (D)  work done by 1 kg of steam at saturation condition
  • (E)  heat consumed in evaporating 1 kg water at 0°C to steam at 100°C and 1.033 kg/cm pressure