- (A) Area of the walls at the floor level
- (B) Internal shaft for sanitary installations up to 2 sq m. in area
- (C) Lift and wall including landing
- (D) Area of cantilevered porch
Exam preparation MCQs with answers
Practice Pakistan's most useful MCQs for competitive exams
Prepare for NTS, PPSC, FPSC and subject-wise tests with fresh multiple choice questions, clear options and quick answer reveal.
Latest MCQs
- (A) Quantity of the materials
- (B) Availability of materials
- (C) Transportation of materials
- (D) All the above
- (A) Specifications of works
- (B) Specifications of materials
- (C) Proportion of mortar
- (D) All the above
- (A) 50 litres
- (B) 65 litres
- (C) 85 litres
- (D) 105 litres
- (E) 135 litres
- (A) 1880 kilo litres
- (B) 2880 kilo litres
- (C) 3880 kilo litres
- (D) 4880 kilo litres
- (A) odour
- (B) colour
- (C) bacterias
- (D) hardness
- (E) turbidity
- (A) [sb² + r² (2bd + sd)²]/(r² – s²)
- (B) [sb² + r² (2bd + sd)²]/(r² – s5)
- (C) [sb² + r² (2bd + sd)²]/(r – s)
- (D) None of these
- (A) Setting out of works
- (B) Site clearance
- (C) Steps in deep excavation
- (D) All the above
- (A) Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
- (B) The centre line is worked out separately for different sections of walls of a building
- (C) The centre line length is reduced by half the layer of main wall joining the partition wall
- (D) All the above
- (A) Earth work in excavation
- (B) Rock cutting
- (C) Excavation in trenches for foundation
- (D) All the above

