The critical path of a network represents_______________________?

Mechanical Engineering Mcqs

The critical path of a network represents_______________________?

(A)  the minimum time required for completion of project

(B)  the maximum time required for completion of project

(C)  maximum cost required for completion of project

(D)  minimum cost required for completion of project

(E)  none of the above