PMTP (predetermined motion time systems) include___________________?
(A) MTM (method time measurement)
(B) WFS (work factor systems)
(C) BNTS (basic motion time study)
(D) all of the above
(E) none of the above
PMTP (predetermined motion time systems) include___________________?
(A) MTM (method time measurement)
(B) WFS (work factor systems)
(C) BNTS (basic motion time study)
(D) all of the above
(E) none of the above
| Share this... |
Facebook
|
Twitter
|
Linkedin
|
Whatsapp
|
Your email address will not be published. Required fields are marked *