Mechanical Engineering Mcqs

Pessimistic time is___________________?

(A)  the maximum time which an activity might require

(B)  the average time required for a job

(C)  the most probable time considering all conditions

(D)  the minimum time in which an activity can possibly be accomplished

(E)  the earliest finish



Share this... Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin
Share on Whatsapp
Whatsapp

  • IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.

  • PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.

  • Related Mcqs


    Leave a Reply

    Your email address will not be published. Required fields are marked *