During load shedding:

Electrical Engineering Mcqs

During load shedding:

(A)  system power factor is changed

(B)  some loads are switched off

(C)  system voltage is reduced

(D)  system frequency is reduced Efficiency is the secondary consideration in



Share this... Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin
Share on Whatsapp
Whatsapp

  • IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.

  • PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.

  • Related Mcqs


    Leave a Reply

    Your email address will not be published. Required fields are marked *