The rise and fall method_______________?

Civil Engineering Mcqs

The rise and fall method_______________?

(A)  is less.accurate than height of instrument method

(B)  is not suitable for levelling with tilting levels

(C)  provides a check on the reduction of intermediate point levels

(D)  quicker and less tedious for large number of intermediate sights