The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called ____________________?

Civil Engineering Mcqs

The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called ____________________?

(A)  Inverted syphon

(B)  Depressed sewer

(C)  Sag pipe

(D)  all of these



Share this... Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin
Share on Whatsapp
Whatsapp

  • IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.

  • PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.

  • Related Mcqs


    Leave a Reply

    Your email address will not be published. Required fields are marked *