Quick lime is (1) slow in setting (2) rapid in slacking (3) good in strength The correct answer is____________?

Civil Engineering Mcqs

Quick lime is (1) slow in setting (2) rapid in slacking (3) good in strength The correct answer is____________?

(A)  only (1)

(B)  only (2)

(C)  both (1) and (2)

(D)  both (2) and (3)



Share this... Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin
Share on Whatsapp
Whatsapp

  • IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.

  • PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.

  • Related Mcqs


    Leave a Reply

    Your email address will not be published. Required fields are marked *