If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be________________?

Civil Engineering Mcqs

If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be________________?

(A)  aqueduct

(B)  superpassage

(C)  syphon

(D)  syphon aqueduct