If the floor is supported at or near the bottom but top chords of a bridge are not braced, then the bridge is called________________?

Civil Engineering Mcqs

If the floor is supported at or near the bottom but top chords of a bridge are not braced, then the bridge is called________________?

(A)  deck type

(B)  through type

(C)  half through type

(D)  double deck type



Share this... Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin
Share on Whatsapp
Whatsapp

  • IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.

  • PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.

  • Related Mcqs


    Leave a Reply

    Your email address will not be published. Required fields are marked *