If the elevation of hydraulic grade line at the junction of three pipes is above the elevation of reservoirs B and C and below reservoir A, then the direction of flow will be___________________?

Civil Engineering Mcqs

If the elevation of hydraulic grade line at the junction of three pipes is above the elevation of reservoirs B and C and below reservoir A, then the direction of flow will be___________________?

(A)  from reservoir A to reservoirs B and C

(B)  from reservoir B to reservoirs C and A

(C)  from reservoir C to reservoirs A and B

(D)  unpredictable