For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of___________________?

Civil Engineering Mcqs

For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of___________________?

(A)  100 cm

(B)  120 cm

(C)  140 cm

(D)  160 cm