Make up water is required in a cooling tower to replace the water lost by___________________?

Chemical Engineering Mcqs

Make up water is required in a cooling tower to replace the water lost by___________________?

(A)  Evaporation

(B)  Drift

(C)  Blowdown and leakage

(D)  All



Share this... Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin
Share on Whatsapp
Whatsapp

  • IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.

  • PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.

  • Related Mcqs


    Leave a Reply

    Your email address will not be published. Required fields are marked *